Highlights
Through Bharat Juru Marg, people will get freedom from jam and also save time.
At present, former Congress President Rahul Gandhi’s Bharat Jodu Yatra is going on in the country.
Jaipur. The chaos of the political crisis and the Chief Minister (Chief Minister) Chief Minister Ashok Gehlot in Jaipur on Thursday amid rumors of a change (Ashok Gehlot) Inaugurated the second major elevated road of the city. He named this new elevated road Bharat Judo Marg. Rahul Gandhi’s Bharat Jodu Yatra (India Couple Pilgrimage) This name placed in the middle brought him back into the limelight.
People of Jaipur have got this gift after 6 years of waiting for Sudala Elevated Road of Jaipur Development Authority. Along with this, the Chief Minister also laid the foundation stone of six other proposed projects.
This elevated road is 2.8 km long.
These days Rahul Gandhi’s Bharat Jodu Yatra is going on in the country. Chief Minister Gehlot named the elevated road along the Yatra and named it Bharat Jodo Marg. Due to this, while on one hand his devotion to Rahul Gandhi came to light, on the other hand he also came into the headlines. JDA has constructed 2.8 km long elevated road located at Ambedkar Circle and Sudala. LIC The building will be connected. Chief Minister Ashok Gehlot first traveled on this elevated road along with some of his ministers.
Indian woman speaks English fluently in Logar among bikini girls on European sea beach.
After six years of waiting, the gift was received
The road work from Ambedkar Circle to Sudala Tirahe has been completed in six and a half years. The construction of this road will relieve the drivers passing through here from the traffic jam of 22 Godam Circle, Hawa Road. On the other hand, going to Sodala Sabzi Mandi from Ambedkar Circle will not only relieve the jam but also save time. After the inauguration of the elevated road, the traffic jam between Sudala and Ram Bagh circle will be relieved. This road will save around 40 minutes of travel time and reduce congestion on Wind Road.
Inauguration and foundation stone of the 472 crore project
The total cost of this project is Rs 250 crore. The total cost of remaining projects is Rs 222 crore. A total of Rs 472 crore worth of projects have been inaugurated and foundation stones laid. This elevated road is 2.8 km long from Ambedkar Circle to Sudala Tirahe and Hawasad, the second lane is 1.8 km long from Chambal Power House to Ambedkar Circle. Also, 119 pillars and 113 spans have been constructed in this lane. Separate ramps have been constructed for entering and exiting the road.
Hindi News 18 Be the first to read breaking news in Hindi. Today’s Latest News, Live News Updates, Most Trusted Hindi News Website News18 Hindi| Read on
Tags: Bharat Jodo Yatra, CM Ashok Gehlot, Congress leader Rahul Gandhi, Jaipur News
First Publication: 07 October 2022, 09:17 IST